post-template-default,single,single-post,postid-411,single-format-standard,bridge-core-2.3.7,ajax_fade,page_not_loaded,qode-page-loading-effect-enabled,,qode-title-hidden,qode_grid_1400,qode-theme-ver-22.3,qode-theme-bridge,qode_advanced_footer_responsive_1000,wpb-js-composer js-comp-ver-7.9,vc_responsive,elementor-default,elementor-kit-322,elementor-page elementor-page-411

NAVIGATING BIG SHIPS UP THE YARRA RIVER

WHAT DOES IT TAKE TO SAFELY MANOEUVER A BIG SHIP UP THE YARRA RIVER?

EXPERIENCE – Years of training including observation of senior pilots, tug utilisation and manoeuvring simulations.

SYSTEMS – A systemised approach including: documented pre-arrival passage planning, DUKC (Dynamic Under Keel Clearance) calculations, bridge clearance calculation, traffic management, environmental factors, propulsion configurations and much more.

INSTRUMENTATION – Customised software and hardware developed inhouse to ensure position and heading accuracy independent of the ship’s equipment.

COLLABORATION – Working together with the ships bridge team and port services to enhance situational awareness in order to achieve the highest safety outcome.

RESULT – The safe delivery of over 3 million containers per year at a value of over $150 billion to Victoria’s economy.